Difference between revisions of "Micro Hydro Power (MHP) Haeusleberg Farm"

From energypedia
***** (***** | *****)
***** (***** | *****)
Line 26: Line 26:
 
{| class="FCK__ShowTableBorders" cellspacing="1" cellpadding="1" width="100%" border="0"
 
{| class="FCK__ShowTableBorders" cellspacing="1" cellpadding="1" width="100%" border="0"
 
|-
 
|-
| [[File:Haeusleberg farm.jpg|370px|frame|A view over the Häusleberg organic farm]]<br/>
+
| [[File:Haeusleberg farm.jpg|370px|A view over the Häusleberg organic farm]]<br/>
| <br/>
+
| [[File:Haeusleberg turbine 1.jpg|370px|Side view of the installed turbine]]<br/>
 
|-
 
|-
| Blah, blah
+
| A view over the Häusleberg organic farm.
| Gobecho I powerhouse
+
| Side view of the installed turbine atop the wooden framed drainage barrel.
 
|-
 
|-
| <br/>
+
| [[File:Haeusleberg turbine 2.jpg|370px|Top view of the installed turbine]]<br/>
| <br/>
+
| [[File:Haeusleberg turbine 3.jpg|370px|The turbine from below]]<br/>
 
|-
 
|-
| Gobecho I weir and intake
+
| Top view of the installed turbine atop the wooden framed drainage barrel.
| Gobecho I turbine
+
| The turbine from below showing the pelton runner at the nozzle mounting bracket.
 
|-
 
|-
| <br/>
+
| [[File:Haeusleberg turbine 4.jpg|370px|The stator]]<br/>
| <br/>
+
| [[File:Haeusleberg turbine 5.jpg|370px|Nozzle alignment test]]<br/>
 
|-
 
|-
| During Gobecho I testing
+
| The stator of the direct drive motor during modifications for the 12 V hybrid system.
| Gobecho I
+
| Nozzle alignment test.
|-
 
| <br/>
 
| <br/>
 
|-
 
| People enjoying the benefits of electricity supplied by the MHP
 
| Gobecho I grid
 
 
|}
 
|}
  
 
[[Category:Germany]]
 
[[Category:Germany]]
 
[[Category:Micro_Hydro]]
 
[[Category:Micro_Hydro]]

Revision as of 22:03, 11 December 2012

Location of the site:

  • Country: Germany
  • DistrictBaden-Württemberg
  • River: Schanzbach
  • GPS Coordinates: 47º55’40.5’’N 7º55’31.2’’E


This small pelton turbine is part of a hybrid system which supplies electricity to the Häusleberg Organic Farm. For more information please go to the project website:

https://sites.google.com/site/haeusleberg/


Start of construction: December 2011
Date of Commissioning: June 2012

 

Ownership / Operation Model: Privately owned

Tariff structure: Not applicable


Turbine: Pelton

Generator: Modified direct drive motor, 3 phase, 20 V, 150 W (approximately)

Error creating thumbnail: File missing

Error creating thumbnail: File missing

A view over the Häusleberg organic farm. Side view of the installed turbine atop the wooden framed drainage barrel.
Error creating thumbnail: File missing

Error creating thumbnail: File missing

Top view of the installed turbine atop the wooden framed drainage barrel. The turbine from below showing the pelton runner at the nozzle mounting bracket.
Error creating thumbnail: File missing

Error creating thumbnail: File missing

The stator of the direct drive motor during modifications for the 12 V hybrid system. Nozzle alignment test.